Hello,
I have 2 x SE6000h invertors each connected to 1 battery via RS485-1.
Modbus Wyenott grid meter connected to the leader.
The 2 invertors are linked thru RS485-2 (1 Master and Follower)
When I connect the 2 invertors together I get issue with energy not being displayed Properly.
Leader say generating 2kw and site power jumps around all over the place. (See below.)
Any pointers would be great.
Using cat5 cable with 1 pair doing the A and B to travel the RS485.